  • Connection Models

    • Technical Information Minimum Connection Model

    • Minimum connection model

      You will take ownership and responsibility of the injection facility which includes:

      • the metering equipment;
      • the gas quality monitoring;
      • the energy content measurement;

      For delivery of the project you can either ask us to:

      • procure and install the remote operable valve (ROV) and telemetry unit (RTU), and
      • construct and connect the pipeline to our gas distribution network.

      or

      • you can procure and install the remote operable valve (ROV) and telemetry unit (RTU), and
      • construct and connect the pipeline to our gas distribution network.

      This delivery model supports Utility infrastructure providers (UIP) and third party connections provided that these companies hold either the appropriate Gas industry registration scheme (GIRS) accreditation or are suitably qualified and competent to carry out construction and connection to our high pressure pipelines.

    • Technical Information Maximum Connection Model

    •  Maximum connection model

      National Grid will have ownership and responsibility for all equipment contained within the injection facility.

      • This does not include the activities upstream of the facility such as:
      • the anaerobic digester
      • the biogas clean up plant
      • any enhancements to the calorific value (CV)

      For delivery of the project

      • National Grid will procure and install the injection facility as well as constructing and connecting the pipeline to our gas distribution network
  • Cust Procurement Image

    Customer procurement connection model (MP/IP only)

    To allow you further ownership of the delivery of the connection we can facilitate a self procurement model that offers the same ownership and responsibility as the Minimum connection model with the additional activity of you undertaking the procurement of the ROV and RTU.

    These items, after commissioning will be owned and operated by National Grid, subject to meeting required specifications/designs.