Banner image
  • Transmission Entry Capacity (TEC) Register & Interconnector Register

  • The TEC register provides a publicly available record of the existing allocation of Transmission Entry Capacity (TEC), the business it is allocated to and the site details.

    Only generators that are directly connected to the National Electricity Transmission System (NETS) or have rights to export to it will be listed in the TEC Register.

    This will be generators with a Bilateral Connection Agreement (BCA) or a Bilateral Embedded Generation Agreement (BEGA).

    The latest TEC Register is located below.

  • 25 May 2017
    TEC Register 25 05 17
    42 KB

    25 May 2017
    Interconnector Register 25 05 17
    12 KB