• Archive: Methodology to Determine the Technical Capacity of the National Transmission System

  • This page contains archive material for the methodology for the determination of Technical Capacity at NTS Exit Points and NTS Aggregated System Points (ASEPs), produced by National Grid in accordance with EU 715/2009.

  • 03 Mar 2011
    Determination of the Technical Capacity of the National Transmission System
    122 KB

  • To aid industry players to understanding of the potential availablity of NTS Exit Capacity National Grid undertook network analysis in March 2011 to determine the quantity of unused capability within various sections of the NTS. This analysis is detailed in the document below.
  • 17 Mar 2011
    Unsold System Capability and Technical Capacity
    150 KB

  •  
    Promo Panel
     
    Title:  Transmission Planning Code
    Sub Title:
    Text:  
    This methodology has now been incorporated into the Transmission Planning Code (TPC). For the latest version of this document please see select the link below.
     
    Link to URL:   More Information
    This methodology has now been incorporated into the Transmission Planning Code (TPC). For the latest version of this document please see select the link below.

    More Information