  • National Grid have a suite of contracts for Utility Infrastructure Providers (UIPs) and Independent Gas Transporters (IGTs) to help them operate on our networks and this page provides information about these contracts and other publications relating to these contracts.

    If you would like to register with National Grid as a UIP, please follow this link.

    If you have any questions about the content of this page or the contracts contained, please contact Box.Commercialcontr@nationalgrid.com.

  • IGT Agency Agreement Process

    National Grid recognise that there are operational requirements on IGT customers, wishing to make CSEP connections to National Grid’s gas distribution network, to contract the physical works and the administration interfaces to a nominated ‘Agent’.

    Where requested to do so National Grid will allow the IGT to formally nominate another organisation to act on their behalf, a guidance note to clarify the process is available from the National Grid website.

    IGT Agency Agreement Process 

  • IGT and UIP Contracts

    Inter-Gas Transporter Connections Agreement
    This contract allows the Independent Gas Transporter to self connect to the National Grid gas distribution system.
    226 KB

    General Conditions of Contract for Site Engineering Works for Connected Offtake Systems
    This contract covers all connection works where National Grid is required to conduct connection and / or reinforcement work in support of a new gas network
    180 KB

    Interim CSEPs Network Exit Agreement
    This agreement sets out the provisions applying to the offtake of gas from the National Grid gas distribution system. The NExA is a generic document, but site specific schedules are produced for each site through the quotation systems. Ancillary agreements are required where any supplies within a non-daily metered (NDM) NExA move to needing to be daily metered (DM).
    170 KB

    UIP Connection, Service Disconnection and Service Alteration Agreement
    This contract allows for Utility Infrastructure Providers (UIPs), to perform self connections, alterations and disconnections to the National Grid gas distribution system.
    207 KB

    General Conditions of Contract for Self-Lay Pipe Systems below 2196000KWH - June 2012
    This contract covers all works by UIPs on pipe systems not exceeding 2,196,000 KwH and provides the basic frameworks that allow the UIP Connection, Service Disconnection and Service Alterations Agreement to function.
    253 KB

    General Conditions of Contract for Self-Lay Pipe Systems above 2196000KWH - June 2012
    This contract covers all works by UIPs on pipe systems above 2,196,000 KwH but below 7 Bar pressure and provides the basic frameworks that allow the UIP Connection, Service Disconnection and Service Alterations Agreement to function.
    365 KB

  • Publications

    01 Oct 2013
    Connections Consultation Paper
    56 KB

    01 Oct 2013
    Customer Choice Booklet
    262 KB

    01 Oct 2013
    Emergency Control Valve (ECV) position relative to a new meter installation
    58 KB

    01 Oct 2013
    Migration of front line IGT support processes within National Grid
    21 KB

    01 Oct 2013
    Public Consultation - Developing Competition in Connection Services
    691 KB