• EU Gas Regulatory Change 2017

      The EU Gas Regulatory Change Programme 2017 is part of the wider EU Gas Regulatory Change Programme that commenced delivery during 2013.

      The changes proposed reflect the amendments to the primary legislation in the Capacity Allocation Mechanism (CAM) Network Code and the Transparency requirements in the EU Tariff (TAR) Network code.

      The associated UNC Modifications are 0597 ‘Rules for the Release of Incremental Capacity at Interconnection Points’ and 0598 ‘Amendments to Capacity Allocation Mechanism to comply with EU Capacity Regulations’.

      This change is initiated primarily to ensure compliance with GB and EU legislation, but it is also proposed to take the opportunity to enhance existing business processes impacted by EU legislation and to improve the quality of data provided to the market.

      We are working with our partners to deliver the system changes in August and October 2017.  We will also be delivering a revised process for CAM Incremental which comes into force on 7th April 2017. 

      Although there will be some system changes to Gemini and MIPI, we do not envisage a high impact to our customers.

      Please let us know if you have any queries by emailing

      box.gasops.businessc@nationalgrid.com  

      *****

       
       The other information on this page is currently under review.

       

       

  • High-level 'Timeline' for delivery

    EU Timeline 2016


  • Latest News.....

    The next stage of EU Gas Regulatory Change goes live on the 13th August with some changes to Gemini, addressing the requirements of CAM Code Amendments and some operational improvements. 

    The changes include:

    Four auctions for IP Quarterly Capacity replaces one auction

    IP Annual Yearly Auction is moving from March to July

    Two new reports a)Entitlement versus Energy Allocation Report b)Utilisation Monitoring Report

    Functionality for Negative Implied Flow Rates (Bacton IP only)  

    The Gemini implementation is due to take place during the planned Gemini Maintenance Window (3.00 – 5.00).

    Any Gemini system issues should be reported to the Xoserve Gemini Service Desk on 0845 600 0506.

    Please email box.gasops.businessc@nationalgrid.com for any other queries regarding these changes.   

    Please continue to use your usual contact routes for any operational day to day issues.

    •  
      Promo Panel
       
      Title:  Common Reference Conditions
      Sub Title:
      Text:  
      Common Reference Conditions: Shippers will now place nominations for Bacton IP at the reference temperatures of  0/25. Gemini will be able to distinguish between gas flowing at a reference temperatures of 15/15 and  0/25
       
      Link to URL:   More
      Common Reference Conditions: Shippers will now place nominations for Bacton IP at the reference temperatures of 0/25. Gemini will be able to distinguish between gas flowing at a reference temperatures of 15/15 and 0/25

      More
    •  
      Promo Panel
       
      Title:  Shipper to TSO Data Exchange
      Sub Title:
      Text:  
      Shippers will now, via registration have the option of using a new data exchange method for the IP Nomination process  utilising the B2B layer
       
      Link to URL:   More
      Shippers will now, via registration have the option of using a new data exchange method for the IP Nomination process utilising the B2B layer

      More
    •  
      Promo Panel
       
      Title:  Minor Impact Changes
      Sub Title:
      Text:  
      Minor changes with minimal external impacts
      
       
      Link to URL:   More
      Minor changes with minimal external impacts

      More
    •  
      Promo Panel
       
      Title:  Previous - 2015 Phase 2 Information
      Sub Title:
      Text:  
      Information from previous Phase 2 Release (Oct/Nov 2015) including the 'Contingency Form' for the new EU Nomination Matching Process at IPs
       
      Link to URL:   More
      Information from previous Phase 2 Release (Oct/Nov 2015) including the 'Contingency Form' for the new EU Nomination Matching Process at IPs

      More
  • Documents

    11 Aug 2016
    COR3572_External_Screen_Pack V2_0

    COR3572 - Phase 3 Delivery of EU Code Changes External Screen Pack This document contains information for internal use only. Copyright Xoserve. All rights reser ved. Author (for this version): Wipro Technologies Owner: Xoserve Document Reference: COR3572_External_S

    2293 KB

    07 Apr 2016
    Shipper Comms (sent 04/03/16)

    EU Phase 3 Customer communications Messages for shippers relating to the impacts of the EU Phase 3 Project March 2015 Version FINAL 1_1 Prepared by: Sarah Carrington Table of contents EU Phase 3 Customer Communications to the Shipper community page page page page page 06 07 12 14 16 What is the scope of the EU Phase 3

    1054 KB

    16 Mar 2016
    EU Phase 3 Update Ops Forum December_2015

    EU Phase 3 Update Phase 3 Project Re-cap EU Phase 3 project primarily aims to meet the obligations set out in the Interoperability and Data Exchange Network Code The scope includes: Common Reference Conditions system solution A new Data Exchange method for the sending of IP nomination data to Gemini A system solution

    210 KB