This website will be decommissioned soon. Our new UK website is now live in Beta.

Please take a look and let us know what you think.
Banner image
  • Balancing and Settlement Code

  • Elexon This Code is managed by Elexon.

  • Methodology Statements for Determination of System-to-System Flow

    Pursuant to Section R7.5.3 of the Balancing and Settlement Code (BSC), it is necessary for the Authority to approved these statements which detail the operational process for determining the System-to-System Flow on the relevant GB interconnectors.  The current statements are provided below.

    For more information on this, please contact Alex Haffner at alex.haffner@nationalgrid.com

  • 15 Apr 2015
    Methodology Statement for Determination of System-to-System Flow on the IFA interconnector between France and England
    155 KB

    15 Apr 2015
    Methodology Statement for Determination of System-to-System Flow on the Moyle Interconnector between Northern Ireland and Scotland
    159 KB

    15 Apr 2015
    Methodology Statement for Determination of System-to-System Flow on the BritNed Interconnector between Holland and England
    90 KB

    15 Apr 2015
    Methodology Statement for Determination of System-to-System Flow on the East - West Interconnector between Ireland and Wales
    153 KB